First Gold strikes again

JULY 27, 2010 – LAVAL, QUEBEC – First Gold Exploration Inc. (TSX.V: EFG) (FSE: F12) is pleased to report the most recent drill results for the Lac Pivert/Rose project. The table below shows the results for holes LR-10-44, LR-10-49 to LR-10-50 and LR-10-52, drilled to test the extension of the zones to the east. All these holes intersected mineralized zones over consistent thicknesses. These positive results demonstrate the continuity and consistency of the lithium, tantalum, rubidium, beryllium, gallium and cesium values.

The Company is receiving laboratory results every day now, having recently submitted samples from over 30 holes; these results will be released in the coming weeks. The Company is also pleased to report that more than 87 holes have been drilled to date, and that the mineralized zones have been intersected in every hole and appears to thicken going east.

The map showing the location of the holes is posted on the Company's website at www.firstgoldexploration.com.

THE NEW RESULTS OBTAINED TO DATE ARE AS FOLLOWS:

HOLE

FROM

TO

TRUE WIDTH

Li20

Rb

Ta2O5

Be

Cs

Ga

No.

(m)

(m)

(m)

(%)

ppm (g/t)

ppm (g/t)

ppm (g/t)

ppm (g/t)

ppm (g/t)

LR-10-44

49.10

50.20

1.10

0.67

3430

415

52

212

69

54.20

65.70

11.50

1.33

2752

215

90

160

64

120.55

122.20

1.70

NSV

3467

369

73

168

80

LR-10-47

 

 

Still pending

 

 

 

 

 

 

LR-10-49

72.10

82.80

10.70

1.36

2855

229

119

126

72

142.50

147.00

4.50

1.21

1317

252

111

91

89

LR-10-50

71.35

85.35

14.00

1.30

2560

245

146

125

67

142.30

145.65

3.35

0.29

2206

260

204

207

88

LR-10-51

 

 

Still pending

 

 

 

 

 

 

LR-10-52

31.50

37.50

6.0

1.04

2903

240

103

105

73

41.65

44.45

2.80

0.29

1428

NSV

40

603

50

 

 

 

 

 

 

 

 

 

 

* 1 ppm = 1 g/t

“I am pleased with the consistency of our results, on surface and over such a large surface area.” said Éric Leboeuf, President of First Gold Exploration.

The Lac Pivert/Rose property lies less than 5 km from the Eastmain 1 powerhouse. There is substantial infrastructure already in place. An access road and a power line cross the property within 1 km of the showings.

Source: http://www.firstgoldexploration.com/


Email to Friend

Fill in the form below to send this gold news to a friend:

Email to Friend
* Your Name:
* Your Email:
* Friend's Name:
* Friend's Email:
* Security Image:
Security Image Generate new
Copy the numbers and letters from the security image
* Message: